Schering-Plough S7
Rigging
R. Baker & Son performed the intricate rigging and installation of Lyopholizer at Schering-Plough Building S7 in Summit, NJ.
R. Baker & Son was required to develop and implement an engineered site specific lifting and rigging plan.
The Lyopholizer was delivered to the site and off loaded from the tractor trailer with a 185' crane. Once off loaded, the Lyopholizer was transported via crane through an opening made on the second floor of Building S7.
A clear path was created from the edge of the building to the final set location. Two supports were installed from first floor slab to the first floor ceiling at the leading edge of the building opening in line with the concrete building trusses located on the interstitial level between the first and second floors. In line with the first floor supports a second set of supports which were installed between the first floor ceiling and the bottom of the concrete building trusses per blueprints.
Scaffold planks were laid in line with concrete support trusses on the second floor of the leading edge of the building to the final location where the equipment was set. These planks were utilized as a tracking system with rollers to travel the equipment from second floor window to its final setting place.
Upon the completion of the rigging activities, all bracing and rigging materials were removed from site and the building was sealed and the area was left in a broom swept condition.
Decommissioning
Demolition Contractors in New York
- Surgical Demolition Project - Turbine Generator - New York (NYC)
- Fulton Fish Market Dismantling / Demolition Project NY - New York, NY
- R. Baker & Son Curtain Wall Projects - New York, NY
- Port Mobil Tank Farm & Builidng Demolition - Staten Island, NY
- World Trade Center Transportation Hub Project - WTC NYC
- Restoration of the United Nations - NYC
- Kings County Hospital - Tri State Area
- JFK'S American Airlines Terminal Demolition - New York
Environmental Services
Investment Recovery
Plant Relocation
Selective Demolition
Trucking / Warehousing
Curtain Wall
Demolition Contractors in New Jersey
- Demolition Project Makes Way for New Renaissance High School - Camden, NJ
- Demolition For New Transmission Station - Harrison, NJ
- Controlled Demolition: Asbestos Abatement
- Con Edison Close Proximity Demolition
- Merck Demolition Project - NJ - New Jersey
- Turnkey Demolition Project - Barceloneta, Puerto Rico
Dismantling
Interior Demolition
- Interior Demolition and Restoration of the UN - New York, NYC
- Forman Mills to K1 Speed Demolition Project in Totowa, NJ - Totowa, NJ
- Covanta Energy & Waste - Demolition - Newark, NJ
- Schering Plough-S11 - Summit, NJ
- Dismantling Project for a Renowned National Laboratory - Princeton, NJ
- Pfizer Exebura - Kalamazoo, MI
Plant and Machinery Movers
Rigging
- Removing Fuel Cells and Cooling Modules at Verizon - New Jersey
- Facility Of The Year Award (FOYA) for Pharmadule Project - New Jersey
- United Nations: Moving The World's Treasures - Manhattan, NYC
- Rigging Fire Truck at 9/11 Memorial Ceremony - Manhattan, NYC
- Domino Sugar: A Slice of History - Brooklyn, NY
- Petrochemical Plant: Rigging & Dismantling - New Jersey
- USS Intrepid - Manhattan, Pier 86, NYC
- Dismantling and Rigging, Plant Relocation Project - New Jersey
- Colgate Palmolive - Jersey City, NJ
- Complex Rigging in Pharmaceutical Plant - NJ