asset recovery, rigging team with sling and interior demolition

Site-Specific Safety Plan - SSSP

Safety Plan, Demolition and Rigging Contractor

A site-specific safety plan (SSSP) is an agreement that addresses project-specific safety concerns and challenges and how to manage them. It serves as a communication tool between involved contractors to ensure safe working conditions and to protect the job site and environment. SSSPs are commonly used on projects performed by R. Baker & Son that include rigging, demolition, dismantling, decommissioning, plant relocation, and more. 

The primary function of a site-specific safety plan is to alert workers to existing and potential hazards and outline the necessary work and safety procedures. Since every project is unique, hazards such as confined spaces, use of cranes during rigging, and various safety concerns that arise during construction and demolition projects will vary from site to site. Work conditions should be constantly monitored and the SSSP should be amended as needed as working conditions evolve and new hazards arise.

Site-specific safety plans are developed by identifying project dangers through an assessment of the scope of work, as well as the tools, equipment, and materials required. The SSSP should outline policies, procedures, and control measures to eliminate or mitigate the hazards in accordance with local, state, and federal regulations. A typical SSSP may include fencing procedures, fall protection, fire and explosion hazards, lockout/tagout, and specialized PPE. They may also include job hazard analyses (JHA), which drill down to focus on specific requirements for individual project tasks.  

The success of a site-specific safety plan hinges on consistent worker training and strict observation of the outlined procedures. R. Baker & Son conducts regular toolbox talks with rigging and demolition teams incorporating SSSP procedures, and frequently attends safety meetings with other project-involved trades. During SSSP meetings, workers are made aware of emergency medical procedures, emergency phone numbers, and procedures for transportation to nearby medical facilities. 

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Business (SDVOB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553
http://rbaker.com/index.php

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

rigging project planning, man welding steel beams
Expert Rigging: Meticulous Planning for Safe Lift Projects

A major rigging project demands meticulous planning and execution. While the actual lift may only span a day or two, it represents the culmination of weeks or even months of intense...
Rigging Equipment, skyline NYC, Women Owned Business
Efficient Rigging and Equipment Setup: Planning and Collaboration

R. Baker & Son was contacted by a large mechanical contractor with whom we have worked in the past and who works in the New Jersey-Philadelphia area. They had a large renovation project that...
Environmental Solutions for Dismantling, Decommissioning and Demolition
Eco-Friendly Solutions for Dismantling, Demo & Decommissioning

Demolition, dismantling, or decommissioning of industrial facilities is a complex process that requires meticulous planning and execution. These sites often contain hazardous chemicals, substances,...
Selective Demolition and Rigging at Process Plant
Selective Demolition and Rigging at Process Plant

R. Baker & Son recently performed selective demolition and equipment rigging for a process plant construction project. The selective demolition was necessary to prepare the existing facility to...
Chiller and Cooling Tower Installation at a South Jersey Hospital
Rigging Success: Chiller & Cooling Tower Installation at Jersey Hospital

Recently, R. Baker & Son team was faced with the task of installing a new 1200-ton chiller and double cell cooling tower at a South Jersey hospital. The project was referred to us by a trusted...
Industrial Workers Rigging 2024
Celebrating a New Year from R. Baker & Son

As a new year begins, we reflect on our deep appreciation for all our employees, associates, contractors, vendors, and customers. Our founder, Ruby Baker, started R. Baker & Son in 1935 during...
Define Demolition Scope and Budget
Maximizing Your Demolition Project - Tips to Define Scope|Budget

Often on large construction and renovation projects, the demolition portion of the Scope of Work is vague or poorly defined. It’s not uncommon to see a boxed-out area on drawings with only a...
Demolition in New York,
Industrial Demolition in NYC: A Look at the Process and Impact

When it comes to industrial demolition in NYC, R. Baker & Son has been trusted for well over 80years. With their expertise, experience, and commitment to safety, they have become one of the most...