R.Baker & Son
R. Baker Logo
R.Baker & Son Home Page R.Baker & Son Safety Page R.Baker & Son News R.Baker & Son Pictures R.Baker & Son Contact
Press Room
Turn Key Services
Rigging Contractors
Dismantling Contractors
Selective Demolition
Total Demolition Contractor
Interior Demolition
Wrecking / Razing Contractors
Plant Decommissioning Contractors
Environmental Services
Investment Recovery
Plant Relocation Services Contractor
Trucking / Warehousing
All Projects
gray space
quick quote
extend navigation
R Baker and Son Press Releases
Wed September 1, 2010, 8:03 am
Sept 2010 Rigging and Demolition Newsletter Available...
(read more)
Thu August 26, 2010, 3:34 pm
R. Baker & Son Ranked #1 Demolition- Wrecking Contractor...
(read more)
Fri August 20, 2010, 8:59 am
Why We Believe R. Baker & Son Is Your Best Industrial...
(read more)
Mon August 2, 2010, 11:02 am
NDA Publishes High Reach Demolition Safety Document...
(read more)
RSS Feed

 

 

PSE&G

R. Baker & Son performed the decommissioning and dismantling of four gunite lined steel stacks from the top of the PSE&G Glenmont, NY powerhouse. Before dismantling of the 20' diameter, 170' tall stack structures, material management was very important. This required the segregation of 240 cubic yard of flyash removed from the breaching, gunite and carbon steel for recycling. In order to perform this procedure, R. Baker & Son secured 8" pipe from the ground to the 9th floor to house 6" kanaflex hose that was used to blow the product into a Turbo-Vacuum truck. All personnel used on this project were 40-hr. HAZWOPER certified and CSE trained.
 