Forman Mills to K1 Speed Demolition Project in Totowa, NJ


Interior Demolition, Environmental

R. Baker and Son completed an extensive interior demolition project in Totowa, New Jersey, transforming a former Forman Mills retail space into a K1 Speed indoor go-kart racing facility. The project required meticulous demolition to reconfigure the existing structure, ensuring the space was fully prepared for its new purpose as a high-energy racing venue.

Project Scope

The demolition involved several critical tasks to reshape the interior:

  • Mezzanine Removal: The team dismantled the entire mezzanine level, including all structural components, to create an open and spacious environment suitable for the go-kart track layout.

  • Wall and Racking Demolition: A wall separating the storage room from the main area was removed, along with all racking systems, to unify the space and maximize usable floor area.

  • Lighting Removal: Existing lighting fixtures throughout the main area were carefully removed to accommodate new installations designed for the dynamic atmosphere of K1 Speed.

Execution Details

The demolition process was executed with a focus on safety, efficiency, and environmental responsibility:

  • Site Safety Measures: The work area was secured with fencing, dust barriers, and clear signage to minimize disruption to nearby businesses. Dust control was maintained using water misting and negative air filtration systems to ensure a clean and safe environment.

  • Utility Management: Prior to demolition, all utilities, electric, gas, and water, were verified as properly disconnected to eliminate risks during the project.

  • Hazard Mitigation: The team conducted thorough inspections for potential hazards like asbestos. Any identified hazardous materials were removed and disposed of by certified crews in compliance with environmental regulations.

  • Interior Strip-Out: Non-structural elements, including walls, ceilings, flooring, and mechanical systems, were carefully removed to prepare the space for the new build.

  • Debris Handling and Recycling: All debris was hauled away, with materials like metal and concrete recycled whenever possible to support environmentally responsible practices.

  • Site Preparation: The site was leveled and prepared to meet K1 Speed’s specifications, ensuring a solid foundation for the new tracks, whether single-level or multi-level.

This comprehensive demolition effort by R. Baker and Son transformed the former Forman Mills location into a fully prepared site, enabling the construction of a state-of-the-art K1 Speed facility ready to deliver thrilling go-karting experiences in Totowa, NJ.

R. Baker & Son - Rigging & Demoliton Contractors
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://www.rbaker.com/demolition-contractors-new-jersey.php

  •  meticulous demolition to reconfigure the existing structure

Decommissioning

Demolition Contractors in New York

Environmental Services

Investment Recovery

Plant Relocation

Selective Demolition

Trucking / Warehousing

Curtain Wall

Demolition Contractors in New Jersey

Dismantling

Interior Demolition

Plant and Machinery Movers

Rigging

Total Demolition

Wrecking / Razing