Cleanroom Demolition - Preventing Particulates

Cleanroom Demolition Contractor in Laboratory

Interior and selective demolition projects involving cleanrooms are particularly sensitive when it comes to control of particulates, temperature, humidity and pressurization. R. Baker & Son is highly experienced in this form of clean demolition and recently completed a project making way for future expansion of existing cleanrooms into other parts of a facility. The project required the removal of existing office and laboratory space, as well as other support areas adjacent to existing cleanrooms.

One of the client’s top concerns during the project was preventing particulates from infiltrating the cleanrooms, so R. Baker & Son put together a plan that would cocoon the demolition area in its own negative space. Step one was to create a barrier wall between the demolition space and clean areas consisting of floor-to-ceiling metal studs lined with thick-mil plastic completely sealing the area. Existing exhaust fans in the demolition area were kept running at almost full speed with MERV 8 blue filter fabric that was checked regularly and changed as needed. A smoke test was conducted to verify the space was negative to all surrounding areas.

A temporary airlock sized for the task at hand was installed to further ensure that contaminants from non-clean areas were not brought into the demolition space. The airlock had a separate HEPA exhaust fan to create a negative chamber and was continually monitored by a magnahelic gauge to ensure negative pressure was maintained. As work proceeded, demolition debris was bagged and placed into brand new plastic tilt trucks, or trash buggies. The buggies were closed and sealed with plastic, carted into the airlock and wiped down. After disposing of the debris, the buggies were again wiped down within the airlock before reentering the demolition area. Blue sticky mats were peeled off multiple times daily.

Upon completion of demolition, the demo area was thoroughly inspected, punch listed and HEPA vacuumed clean. The space was ready for construction of new cleanrooms that would eventually be added. The client was fully satisfied with the demolition project outcome and R. Baker & Son’s performance from start to finish.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

http://rbaker.com/selective-demolition.php

Full News Archive

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

demolition workers looking at blueprints
R. Baker & Sons Demo Experience to Find the Best Plan

“Why Didn’t I Think of That?”: Count on R. Baker’s & Son’s Demolition Experience to Find the Best Plan One of the great benefits of hiring experienced contractors...
Construction workers shaking hands on demolition project
Top Rigging & Demo Performance on Front Stage and Backstage

It is critically important to us at R. Baker & Son to understand our customers’ opinions of us and how satisfied they are with our services. If a customer felt there was some aspect of...
Safety is a Mindset at R. Baker & Son 
Safety is a Mindset at R. Baker & Son

Every construction project is different, from site to site, in size and scope, and in the overall approach to safe work practices. Where many projects take safety very seriously, plenty of others are...
Water Treatment Systems
Disassemble and Relocate Water Treatment Systems

When a food manufacturerand longtime R. Baker & Son clientdecided to sell off their existing reverse osmosis and pH waste neutralization systems at their northeastern Pennsylvania manufacturing...
Dust, Noise, and Vibration on Demolition Sites
Planning for Dust, Noise, and Vibration on Demo Projects

Planning for dust, noise, and vibration can be an important part of demolition and dismantling, particularly in and near occupied buildings and in densely-populated areas. R. Baker & Son works...
Machinery moving, assembly project, used conveyor system
Machinery Moving and Assembly Project

A manufacturer was referred to R. Baker & Son for help with a plant expansion project. A used conveyor system was being added to their production line connecting several newly-leased pieces of...
Rigging and Assembling Test Equipment-NJ Processing Facility
Rigging and Assembling Test Equipment-NJ Processing Facility

An R. Baker & Son previous client was rapidly growing and had plans to refine and expand their operation. Their R&D test team had been working with several engineering firms to design and...
Concrete Slab X-Rays Enable Accurate Cutting and Drilling
Concrete Slab X-Rays Enable Accurate Cutting and Drilling

R. Baker & Son was recently involved in a selective demolition project at a four-story, 90,000 sq. ft. R&D lab facility with basement and penthouse where all forty-six laboratories would be...