R. Baker Contributes to Pharmaceutical Client Winning FOYA

R. Baker and Son All Industrial Services’ Efforts Contribute to Facility of the Year Award

R. Baker & Son All Industrial Services, an expert dismantlement, demolition, rigging and re-installation contractors, contributed to a global pharmaceutical company winning the Facility of the Year Award 2008 in the category of Equipment Innovation.

The Facility of the Year Awards program, sponsored by ISPE, INERPHEX, and Pharmaceutical Processing Magazine, recognizes state-of-the-art pharmaceutical manufacturing projects that utilize new and innovative technologies to enhance the delivery of a quality project, as well as reduce the cost of producing high-quality medicines.

The expansion project began by the Fortune 500 pharmaceutical company awarding R. Baker and Son All Industrial Services (R. Baker & Son) the interior demolition and equipment salvage contractor work.  The goal of this phase of the project was to perform a total interior gut out while leaving the structural members in place.  This required an immense amount of preparation, coordination and attention to safety.  After making sure all environmental concerns were addressed properly and that utilities had been disconnected or relocated, equipment salvage was commenced.  R. Baker & Son was able to help the client offset some of the costs of the project through their expertise in process equipment sales and salvage.  Once the salvaged equipment was removed and sold, the remaining interior demolition was conducted.  This included demolition of all CMU walls, removal of elevator and stairwells, removal of sheet rock walls and drop ceiling and all remaining interior non load bearing structures.  In addition, a significant portion of the first floor slab was removed along with all equipment pads on the penthouse floor.

After interior demolition services were completed, R. Baker & Son repaired all floor openings as per specifications which included new rebar and concrete.  The client then performed the necessary pre- construction tasks in preparation to receive the new equipment for the expansion project.

R. Baker & Son was then called back in to perform the next phase of work which was the reinstallation of the new equipment.  R Baker & Son was intricately involved with the detail development of the scope of work with vendor equipment shop drawings (many in German). The scope of work was to receive, rig, set and assemble/install all of the process equipment for the project. This included the new Lyopholizer, Automated fill line, process chiller, formulation isolation equipment, process air handlers, Fluid beds MP3 and MP4. Control cabinets, HMIs, various isolation chambers and complete assembly of all shipped parts from the factory acceptance tests. The shipped parts were stored in a clean area and boxes of parts numbered in the hundreds. Laser precision was needed to set equipment due to tight tolerances.  R. Baker and Son performed any necessary shimming, pressure testing, mounting, leveling, and daily protection of the new epoxy floors which could not be damaged.

R. Baker & Son was also tasked with assisting with commissioning and startup of the newly installed equipment.  The startup process was completed with ease due to all the upfront technical planning and the expert installation performed by the R. Baker & Son re-installation crews.

Despite the complexity of rigging and re-installing this delicate and very expensive process equipment, R. Baker & Son was able to safely and efficiently complete the project without damage to any of the equipment.  The project was also on-schedule and within budget.

R. Baker & Son also participated in the project’s Star Program of OSHA’s Voluntary Protection Program (VPP). As always, safety was of highest priority, and the job was completed without incident.

For more information on the project visit http://www.facilityoftheyear.org/categorywinners2008.cfm.  For more information on R. Baker & Son’s capabilities and projects completed, visit http://www.rbaker.com

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor in the United States, Canada and Puerto Rico.  The veteran founded company has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million).  Capabilities include industrial and commercial demolition, riggingmachinery & plant moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, wrecking, selective demolition , demolition contractors in NJ and warehousing.

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: www.rbaker.com

For more information visit our website or contact Damon Kozul, PE, CHMM at dkozul@rbaker.com

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Toolbox Talks, R. Baker & Son Demolition Crew
Safety Through Dialogue: The Critical Role of Toolbox Talks

Toolbox talks are a cornerstone of effective company safety programs. These informal safety meetings, typically held on job sites before work begins, focus on specific safety topics and are designed...
Safety in Construction
The Critical Importance of Safety Investment in Construction

In the construction industry, and especially our industry, investing in safety is not just a regulatory requirement—it's a strategic decision that yields numerous benefits. A comprehensive...
Demolition company discussing pricing
Understanding the Difference Between Lowest Price and Best Price

In purchasing services, particularly in contracting, it's crucial to understand that the "lowest price" rarely equates to the "best price." Smart purchasing involves looking...
R. Baker BIM Laser Scans for Demolition Project
Accelerated Project Timelines with R. Baker BIM Laser Scans

R. Baker was awarded a large demolition project in an existing 130k sq/ft laboratory facility to make way for a new modern lab facility. Our client had presented us with a very aggressive demolition...
Positive Safety Habits - Industrial Rigging Equipment
Building a Safer Environment: The Power of Positive Safety Habits

Safety is contagious, much like many other human behaviors. We are naturally inclined to be influenced by positive examples set by others. When a driver buckles up, passengers often follow suit. This...
Rigging and Replacing Old Equipment - Boilers, Chilling Towers
R. Baker Seamlessly Rigging and Replacing Old Equipment

Recently, a large hospital in central New Jersey successfully completed extensive HVAC and electrical changes. These changes, which were a significant undertaking, included replacing two chillers and...
Hospital Corridor Before Demolition by R. Baker & Son
R. Baker & Son Hospital Wing Interior Demolition

R. Baker & Son was awarded a project to perform interior demolition of a 55,000 sq/ft three-story patient area in a New York hospital. The wing, erected in the early 1980s and renovated in the...
Rigging Equipment Contractor - Rigging lift in NYC
R. Baker & Son's Rigging Expertise Shines in Pharma Expansion

R. Baker & Son, an industrial tri-state contractor specializing in selective demolition and rigging services, showcased our exceptional skills during a challenging project at a high-tech...