The Complexity of Plant Relocation Projects

The Complexity of Plant Relocation Projects

Plant relocation projects are a complex undertaking that requires professionals with years of experience and a resume of successful projects under their belt. If a complex plant relocation is done poorly it could result in runaway costs as well as lost market share, reputations and employees along the way. R. Baker & Son All Industrial Services is expert in plant relocation projects.

Plant relocation is never as simple as picking up your process in plant A and setting them down in plant B. Plant and product line moves and relocations are always much more difficult than planned or anticipated. With contractors who do their homework, know the risks upfront, have a contingency plan, and carefully manage the move, your project should be a success.

Once the decision has been made to relocate, a detailed plan must be drafted in parallel with a schedule. Important questions must be addressed: Will it be necessary to temporarily outsource plant operations? What is the critical path and non-critical path? There are very complex, intricate relationships and dependencies with plant products, equipment and utilities. Make sure the new plant can accommodate all of the operating requirements for equipment process and or products. Business interruptions are more expensive to address than physical or manufacturing process issues.

Many plant relocation projects are done in phases as most plants carry different product lines, each having their own profit centers. The relocation plan needs to address each part and phase of the relocation. Disconnecting and reconnecting to shared utilities is important and should be planned on both sides of the move from plant A to plant B.

Plant relocation project teams need to consider all risks associated with the move and how their impact can be minimized. Every project requires a contingency plan, a “what if” scenario. The quality of the move team is critical to the project’s success. Choose a highly experienced contractor plant relocation contractor like R. Baker and Son to ensure your project’s best possible outcome.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
http://www.rbaker.com

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Environmental Solutions for Dismantling, Decommissioning and Demolition
Eco-Friendly Solutions for Dismantling, Demo & Decommissioning

Demolition, dismantling, or decommissioning of industrial facilities is a complex process that requires meticulous planning and execution. These sites often contain hazardous chemicals, substances,...
Selective Demolition and Rigging at Process Plant
Selective Demolition and Rigging at Process Plant

R. Baker & Son recently performed selective demolition and equipment rigging for a process plant construction project. The selective demolition was necessary to prepare the existing facility to...
Chiller and Cooling Tower Installation at a South Jersey Hospital
Rigging Success: Chiller & Cooling Tower Installation at a South Jersey Hospital

Recently, R. Baker & Son team was faced with the task of installing a new 1200-ton chiller and double cell cooling tower at a South Jersey hospital. The project was referred to us by a trusted...
Industrial Workers Rigging 2024
Celebrating a New Year from R. Baker & Son

As a new year begins, we reflect on our deep appreciation for all our employees, associates, contractors, vendors, and customers. Our founder, Ruby Baker, started R. Baker & Son in 1935 during...
Define Demolition Scope and Budget
Maximizing Your Demolition Project - Tips to Define Scope|Budget

Often on large construction and renovation projects, the demolition portion of the Scope of Work is vague or poorly defined. It’s not uncommon to see a boxed-out area on drawings with only a...
Machine skates and heavy load movement - Rigger
Rigger's Guide to Machine Skates - Role in Heavy Load Movement

In the realm of rigging, machine skates, also known as moving skates, roller skids, or dollies, have been used in one form or another throughout history. In their various forms, these devices are...
excavator at demolition site, questions about demolition contracting
Seven Key Questions Clients Want to Know About Demolition

When it comes to demolition projects, ranging from total building teardowns to selective demolition and everything in between, clients are faced with the challenge of finding the right demolition...
Interior Demolition Project - School Converted to Residential Units
Interior Demo of Old School for Conversion to Residential Units

An architect that R. Baker & Son has collaborated with reached out to us with a special interior demolition opportunity in South Jersey. The project held sentimental value for her as it involved...