All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

Rigging Streamlines NJ Hospital Renovation Mobilization

Crane rigging sets construction trailers at NJ hospital renovation site

Getting a new project up and running requires planning, organization, and detailed layout, all of which must be done quickly and efficiently. This was certainly the case when one of our clients, a CM firm, needed to mobilize and set up a camp for a large renovation and addition at a New Jersey hospital. Boots on the ground, as time was of the essence. Our client needed to show their client they could mobilize and get started as quickly as possible, as promised.

We sat down with the current mobilization plan and made a few suggested changes to better facilitate getting material and equipment in and out, drawing from our many decades of experience as professional riggers.

Site Challenges

The area designated for the construction trailers was off to the side of the property in a low-lying area where protective storage and open laydown areas were very difficult to access and had little maneuverability. This required lifting and placing construction trailers and Connex storage boxes directly into place via crane. There was no storage at all inside the facility, and parking lots were very busy and active. Making this all work in a small area was critical. Getting it wrong would mean struggling and relocating things throughout the project, time that was not in the schedule.

Strategic Layout and Execution

This required layout and marking of four large 60-foot ganged office trailers, four individual 50-foot subcontractor trailers, eight Connex storage boxes of different sizes, and a laydown area with bathrooms - all with just enough room for Lulls, forklifts, and Bobcats to maneuver in and out efficiently.

Within a two-day period, all of the trailers and Connex boxes were set in place according to plan. The trailer company was quickly able to join trailers together where needed, set them in place, and add stairs and other accessories. Power, which had been pre-planned and made available, was connected by the electricians in one and a half days. The project's mobilization was complete within a one-week timeframe. The hospital was very impressed with the layout and timely installation.

Additional Critical Services

R. Baker also assisted in rigging and setting two one-megawatt Caterpillar temporary generators alongside the loading dock area, as one of the first orders of business was to remove the two existing outdoor generators to make way for the new hospital addition foundation. This required putting stone down on the grassy area, lifting and placing the generators with belly tanks to their exact location, and helping to support and protect the power cabling.

Warehouse and Logistics Support

Beyond the initial mobilization, our client also contracted R Baker to handle and store large, critical deliveries in our warehouse facility and deliver them to the construction site exactly when needed for installation. This just-in-time delivery approach was crucial for a project where on-site storage space was virtually non-existent.

The major components we managed included an electrical substation, several custom air handlers, two large York chillers, along with specialized flooring materials and doors. Each of these items required careful handling, climate-controlled storage, and precise delivery timing to coordinate with the construction schedule. Our warehouse team worked closely with the project managers to ensure that materials arrived exactly when installation crews were ready, preventing costly delays and eliminating the need for on-site storage in the cramped hospital environment.

Project Success and Client Impact

The comprehensive mobilization services and reliable on-time deliveries took a significant operational load off our client, allowing their project management team to focus their attention and resources on other critical areas of this very challenging and complex construction project.

By handling the logistics, storage, and precision placement of equipment and materials, R Baker enabled the CM firm to demonstrate their capabilities to the hospital client while maintaining the aggressive timeline that was essential to the project's success. The seamless execution of the mobilization phase set a positive tone for the entire renovation and addition project.

R. Baker and Son is a Minority and Women-Owned Business Enterprise (M/WBE). Please contact us to discuss how we can help you meet your contracting and subcontracting goals in NY, NJ and Nationwide.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://www.rbaker.com/rigging-services.php

Full News Archive

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Demolition Equipment in the field, R. Baker & Son
Sustainable Demolition Services: R Baker's Lean Meets Green Approach

Over our 90 years in business, R. Baker & Son has witnessed tremendous changes and progress in the demolition industry. Today's demolition work presents unique challenges and opportunities...
Warehousing and industrial rigging services for plant relocation.
Plant Relocation Services: Planning & Production | R. Baker & Son

The decision to relocate a manufacturing facility represents one of the most significant undertakings a company can face. Success hinges on expert project management, strategic planning, and seamless...
Rigging equipment ready for a heavy lift, NYC, NJ
Industrial Rigging NYC & NJ: Choosing Your Urban Partner

New York City and New Jersey's iconic skylines? They're pure proof of incredible construction and engineering. But peel back the layers of every towering building and complex industrial spot,...
Heavy equipment rigging during the installation of a new grain silo and processing system by R Baker.
Grain Silo & Equip. Installation: R Baker

R. Baker recently completed a challenging and uniquegrain processing installation, involving theheavy equipment riggingandindustrial equipment installationof four 70-foot processgrain silos, an...
Specialized healthcare demolition ensuring sterile environments with ICRA compliance.
Healthcare Demolition: ICRA Protocol & Clean Environments

Healthcare facilities present some of the most challenging environments for interior and selective demolition projects, where maintaining a sterile, contamination-free environment is absolutely...
lean construction meeting for Rigging NYC, NJ
Lean Construction: Optimize Demolition, Rigging & Dismantling Projects

Many R. Baker clients have adopted and use the lean construction process on their projects, the list includes most pharmaceutical companies, energy companies, manufacturing of all kinds along with...
Secure storage of industrial boiler for rigging and assembly projects in New York and New Jersey.
Rigging Services for NYC and NJ: Offsite Storage & Asset Management

For rigging projects in New York City and New Jersey, access to secure offsite storage and asset management is a crucial component of rigging, setting, and assembly operations,helping accommodate...
Safe rigging procedures and equipment inspection - R. Baker & Son
Rigging: A Complete Guide to Safety, Equipment, and OSHA Standards

Rigging is one of the most critical operations in heavy industry, and at R. Baker & Son, we specialize in safe, compliant lifting with the right equipment, planning, and OSHA-certified practices....