All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

Rigging Safety Guidelines and Procedures

Rigging Safety Guidelines - Industrial Services

Safety is paramount at R. Baker & Son, which is why we strictly observe all rigging safety regulations, guidelines and procedures on every lift we do. 

Guidelines for rigging safety:

Inspect the condition of your equipment on a daily basis.  Check cables for kinks or worn or broken wires, and slings and straps for fraying or cuts.  Hooks, shackles, and pins should not be bent, and metal should not show corrosion, cracks, or excessive wear.  Any equipment showing damage, no matter how slight, must be immediately removed from service.  

*Know your equipment, and use it properly: equipment and accessories should be selected based on precise load size and weight analyses and calculations.  There is no room for error in rigging; if a load doesn’t meet the safe capacity, don’t make the lift.  

*Develop an approved pick plan where required and whenever possible.  Determine whether a tagline is necessary, especially where clearances are limited.  

*Check slings and connections: Before lifting, remove slack from slings and watch for sharp or jagged edges that may damage the sling.  Ensure that connection points are tight and secure.  

*Position cranes on stable ground and make sure the area is sufficient to accommodate the crane outriggers, and the load.  

*Take precautions when there are high winds, and be prepared for sudden gusts.  If winds exceed or threaten to exceed safe limits, do not make the lift.

*Designate team leaders and signal persons, and assign specific roles to team members taking part in the lift. 

*Crane operators should first lift a load a few inches to make sure it is properly balanced and secured and the equipment is functioning properly.  

*Loads should be moved smoothly over the planned route, with no sudden movements. When necessary, riggers use taglines to control a load and prevent spinning from a safe distance.  

R. Baker & Son’s expert team includes master riggers, professional engineers, and skilled rigging tradesman capable of handling even the most challenging and complex rigging projects. We provide clients with a full selection of rigging services including rigging of heavy equipment and machinery, sensitive pharmaceutical and manufacturing equipment, rigging and dismantling of equipment and process lines, equipment salvage and removal, match marking, reinstallation, and millwrighting. 

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Business (SDVOB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

http://rbaker.com/

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Environmental Solutions for Dismantling, Decommissioning and Demolition
Eco-Friendly Solutions for Dismantling, Demo & Decommissioning

Demolition, dismantling, or decommissioning of industrial facilities is a complex process that requires meticulous planning and execution. These sites often contain hazardous chemicals, substances,...
Selective Demolition and Rigging at Process Plant
Selective Demolition and Rigging at Process Plant

R. Baker & Son recently performed selective demolition and equipment rigging for a process plant construction project. The selective demolition was necessary to prepare the existing facility to...
Chiller and Cooling Tower Installation at a South Jersey Hospital
Rigging Success: Chiller & Cooling Tower Installation at a South Jersey Hospital

Recently, R. Baker & Son team was faced with the task of installing a new 1200-ton chiller and double cell cooling tower at a South Jersey hospital. The project was referred to us by a trusted...
Industrial Workers Rigging 2024
Celebrating a New Year from R. Baker & Son

As a new year begins, we reflect on our deep appreciation for all our employees, associates, contractors, vendors, and customers. Our founder, Ruby Baker, started R. Baker & Son in 1935 during...
Define Demolition Scope and Budget
Maximizing Your Demolition Project - Tips to Define Scope|Budget

Often on large construction and renovation projects, the demolition portion of the Scope of Work is vague or poorly defined. It’s not uncommon to see a boxed-out area on drawings with only a...
Machine skates and heavy load movement - Rigger
Rigger's Guide to Machine Skates - Role in Heavy Load Movement

In the realm of rigging, machine skates, also known as moving skates, roller skids, or dollies, have been used in one form or another throughout history. In their various forms, these devices are...
excavator at demolition site, questions about demolition contracting
Seven Key Questions Clients Want to Know About Demolition

When it comes to demolition projects, ranging from total building teardowns to selective demolition and everything in between, clients are faced with the challenge of finding the right demolition...
Interior Demolition Project - School Converted to Residential Units
Interior Demo of Old School for Conversion to Residential Units

An architect that R. Baker & Son has collaborated with reached out to us with a special interior demolition opportunity in South Jersey. The project held sentimental value for her as it involved...