asset recovery, rigging team with sling and interior demolition

Precon Services for Demolition, Rigging & Plant Relocation

R. Baker & Son rigging crew performing pre-construction planning and heavy equipment rigging for demolition and industrial plant relocation project

For more than 90 years, R. Baker & Son has been delivering expert precon services for demolition, rigging, and industrial plant relocation projects. Before any construction work begins, our team develops detailed pre-construction plans that help clients save time, reduce costs, and eliminate surprises.

From scheduling and budgeting to layout and execution, the precon phase is where critical decisions are made that determine a project's overall accuracy, efficiency, and outcome. A thorough precon effort means fewer surprises, tighter timelines, and a significantly better return on investment.

The most important work on any project happens before construction ever begins. That's where decades of hands-on experience truly pay off and why so many owners and construction managers bring R. Baker & Son in as part of their precon team. With over 90 years in the industry, no other contractor brings that level of depth to the planning table. That experience translates directly into time savings, cost savings, and smarter execution from day one.

What Precon Looks Like at R. Baker & Son

R. Baker & Son's precon process is thorough, detail-driven, and tailored to each project. All demolition and selective demolition procedures are carefully evaluated and outlined to meet each client's specific needs. Rigging and routing plans define how, when, and where equipment will be moved - accounting for sizes, weights, and separation points. Mobilization and demobilization plans address the full logistics of moving cranes, lulls, and other heavy equipment, ensuring nothing is left to chance.

Debris separation and removal are built into the precon plan from the start. Hazardous materials are identified early, and clean demolition and remediation plans are developed to satisfy all regulatory requirements. Dust, noise, and vibration management are addressed in detail, and equipment delivery and storage locations are determined well in advance. All available LEED rating points are identified as part of the process.

Finding Smarter Ways to Get the Job Done

One of the greatest advantages of a strong precon effort is the opportunity to identify innovative, cost-effective solutions before work begins. R. Baker & Son actively looks for ways to streamline execution - whether that means sourcing local offsite storage and assembly to ensure equipment arrives exactly how and when it's needed, incorporating prefabricated pieces or systems to support project timelines, or identifying assets and asset recovery opportunities that can help offset overall project costs. Asset recovery, in particular, is a common and effective way to add value that many project teams overlook.

Precon Applies Across All Project Types

Pre-construction planning isn't limited to new construction. It plays an equally critical role in renovation projects and is a significant factor in plant relocation projects, where the complexity of moving active operations demands precise coordination and foresight.

With over 90 years of project experience, R. Baker & Son has the knowledge and resources to plan, support, and execute at the highest level - delivering the accuracy, innovation, and reliability our clients count on every time.

R. Baker & Son - All Industrial Services 
190 Boundary Road
Marlboro, NJ 07746
732-222-3553
https://www.rbaker.com/index.php

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Heavy equipment rigging for data center power infrastructure - R. Baker & Son
Turnkey Data Center & Energy Infrastructure Rigging

The digital economy and the new energy economy are being built simultaneously, and both require moving extremely heavy, extremely expensive, and extremely sensitive equipment with zero margin for...
The finishing beam used in the process weighed 2,600 lbs and had to be perfectly parallel and level to the drum it was refinishing, both within less than 1/64 of an inch.
Industrial Drum Refinishing Support: A Custom Rigging and Structural Solution

When a manufacturer we had previously performed rigging assembly and installation work for returned more than a year later with a unique and complex challenge, they knew who to call. The company...
Air skates (air casters) lifting and moving multi-ton industrial equipment using compressed air in a plant relocation project
Air Skates: How to Move Multi Ton Loads Without Touching the Floor

Air skates, also known as air casters, air skids, or air dollies, are a specialized rigging solution that R. Baker & Son has deployed for many years to move heavy machinery, fragile equipment,...
demolition innovation in protection - substation, non metallic wire mesh,
Demolition Protection: Safeguarding People, Property & Critical Systems

What Demolition Protection Truly EntailsIn the complex world of demolition, protection goes far beyond basic safeguards. As therecognized leader in demolition protection, R. Baker & Son defines...
Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...