Rigging Plan Consulting and Estimating

planning and estimation stages - rigging company

On construction and renovation projects that include installation or relocation of equipment and/or building systems, construction managers and general contractors should consider consulting with an experienced rigging company like R. Baker & Son during the planning and estimation stages. CMs and GCs will often go it alone to determine how to move equipment into a building efficiently and on time, then estimate the cost to do so. The problem is that most are not aware of equipment and techniques available to riggers, nor do they have the ingenuity that comes from years of rigging experience. Tapping into R. Baker & Son’s vast rigging expertise could mean tens, or even hundreds, of thousands of dollars in cost savings as well as substantial time shaved off the overall project schedule, and it could make all the difference in project awards. 

Case in point, a CM firm had put together a project estimate and schedule for a pharmaceutical construction project, but had some doubts about using their own rigging and routing plan, so R. Baker & Son was called in to consult and provide rigging services. We quickly determined that, by adding two large skylights, building equipment including two chillers, several air handlers, compressed air, two boilers, and a waste neutralization system, could be rigged into the mechanical room more quickly and easily than original estimates. Additionally, the skylights would provide natural light in the mechanical rooms, reducing lighting and energy needs. 

R. Baker & Son’s revised rigging and routing plan also specified that process equipment including liquid and gas chromatographs, isolators, lyophilizers, autoclaves, and bioreactors could be hoisted and lowered down a freight elevator shaft to the first three floors of the building using a 130-ton crane with extended boom. The shaft was temporarily capped for access and protection from the weather, allowing timely installation of walls and floors by other trades. We also identified several doors that would need to be widened for future building maintenance and equipment replacement. 

Overall, R. Baker & Son’s new plan shaved five weeks and $260,000 from the CM’s original estimate.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Minority and Women-Owned Business Enterprise (M/WBE), in business since 1935, is a premier specialized contractor operating in the United States, Canada, and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities of over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://rbaker.com/

Full News Archive

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Fire truck being lowered into 9/11 Museum NYC
Spreader Beams a Top Choice for Rigging Stability and Safety

The spreader beam, also known as a spreader bar, is a popular below-the-hook lifting device used to widen lifting points and stabilize and support a load during a crane lift. It consists of a long...
Safety Basics for Demolition Work, photo shows lighting around demolished concrete
Important Safety Basics for Interior Demolition Projects

Demolition can be a dirty business with ever-changing safety concerns. Every project is unique, but there are three basic things that should be addressed in every interior demolition project to help...
Tool and Equipment Tracking - Crane Rigging NYC
Tool and Equipment Tracking - Crane Rigging

Crane rigging requires a lot of tools and equipment. Visitors to a large R. Baker & Son rigging operation might see forklifts, cranes, excavators, generators, articulating booms, front loaders,...
 Sweeping Compounds for Cleanup of Demolition Dust, Dirt, Silica, and Other Particulates
Cleanup of Demolition Dust, Dirt, Silica, and Other Particulates

Demolition is a dirty job that can produce layers of dirt, dust, and silica that settle on floors and other flat surfaces. There are various techniques and equipment such as misting cannons,...
Rigging equipment, rigging hook, NYC
Auger and Centrifuge Rigging Project

An existing customer called R. Baker & Son needing assistance with rigging equipment duringtheir facility’s annual cleaning and maintenance project. The manufacturing plant was set up for...
Cooling Tower Dismantling Project
University Cooling Tower Dismantling Project

A large Staten Island mechanical contractor contacted R. Baker & Son to remove a 1,000-ton cooling tower at a university to make way for a new high-efficiency tower and filtration system. The...
Danger sign for rigging, dismantling & demolition site
Rigging, Dismantling & Demolition Project Safety

Safety is the number one priority on every R. Baker & Son project, from dismantling, rigging, and demolition, to plant decommissioning, plant relocation, and environmental services. Safeguards...
construction worker performing a multi heat exchanger changeout 
Baker Performs Multi Heat Exchanger Changeout

Back in early 2021, R. Baker & Son took part in a food manufacturing construction project in which we performed rigging and assembly of six large, high-pressure steam ovens over a ten-week...