proper lighting and ventilation throughout a demolition project

Having the proper lighting and ventilation throughout a demolition project is important to ensure safe conditions for workers and site personnel. Though often overlooked by other demolition contractors, R. Baker & Son develops and implements lighting and ventilation plans on every project we do.

Low lighting levels can a pose a significant hazard on a demolition project and can be directly connect with increased injury. Years ago, worksite lighting typically consisted of 100W incandescent lightbulbs spaced forty to fifty feet apart on stringers, and bulbs that burned out often went unchanged. Nowadays, a demolition contractor should provide sufficient lighting with high-output mercury vapor, LED, or quartz lighting with protective cages. Lighting should be at least 3W per square foot, though some areas may require more. Shafts, pits, and other dark pockets require their own lighting, rather than depending on general area lighting to illuminate them. Demolition lighting requires constant vigilance in that lighting and lighting circuits must be relocated as work progresses to keep lighting levels sufficient and fixtures in good working order for the duration of the project.

Dirt, dust, and other particulates are an inherent part of every demolition project. Ventilation can be handled either by using the existing HVAC system, or by bringing in temporary ventilation in the form of sufficiently-sized exhaust fans. Like lighting, ventilation requires constant attention to ensure that filters are clean and equipment is running and performing properly. There should be several air changes per hour at minimum, which can be determined easily by calculating the total volume of the space, but more may be required depending on the task at hand. In demolition areas adjacent to clean spaces, a flow indicator or magnehelic gauge should be used to ensure that dust does not escape.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
http://www.rbaker.com

Full News Archive

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Machine skates and heavy load movement - Rigger
Rigger's Guide to Machine Skates - Role in Heavy Load Movement

In the realm of rigging, machine skates, also known as moving skates, roller skids, or dollies, have been used in one form or another throughout history. In their various forms, these devices are...
excavator at demolition site, questions about demolition contracting
Seven Key Questions Clients Want to Know About Demolition

When it comes to demolition projects, ranging from total building teardowns to selective demolition and everything in between, clients are faced with the challenge of finding the right demolition...
Interior Demolition Project - School Converted to Residential Units
Interior Demo of Old School for Conversion to Residential Units

An architect that R. Baker & Son has collaborated with reached out to us with a special interior demolition opportunity in South Jersey. The project held sentimental value for her as it involved...
heavy machinery moving, Versa-Lift
Versa Lift

When it comes to the demands of moving heavy machinery and materials, there are few tools that can handle these tasks better than the Versa-Lift by Custom Mobile Equipment, Inc. Not to be confused...
The Importance of Using the Right Rigging Equipment
Emergency Call Shows - Value of the Right Rigging Equipment

The importance of using the proper equipment for a rigging operation was illustrated recently when R. Baker & Son responded to a late afternoon emergency call from one of our regular...
Wall and structural support - Rigging and Demolition
Structure Support is Critical on Demolition Projects

Supporting a structure is a critical part of many interior demolition, selective demolition, and dismantling projects. Proper shoring and bracing require an experienced demolition contractor that has...
rigging project of stainless-steel tanks
R. Baker & Son Saves Client Over $100K on Rigging Project

Last winter, R. Baker & Son was contacted by a consulting engineer we’d worked with in the past asking us to take a look at a rigging project. Another rigging contractor had previously been...
excavator for demolition and rigging equipment
Hats Off To Mechanics

There are various pieces of machinery that provide the muscle for demolition and rigging projects, from large cranes and excavators to smaller equipment like skid steers, scissor lifts, articulating...