Rigging Inspection

Rigging Inspection
They say a chain is only as strong as its weakest link, which is exactly the case with rigging equipment. Crane hooks, slings, shackles, and spreader bars are all single points of failure, meaning one small failure of one piece of hardware can be catastrophic. OSHA part number 1910.179 A1 and 1910.179 A3 define different types of cranes, of which there are many. OSHA permits only trained, qualified employees to use this equipment and requires its inspection under 1910.184.

The key to rigging safety is identifying hazards, being knowledgeable about rigging, knowing the equipment and hardware you will be rigging with, having a pick plan, and inspecting all equipment that will be used thoroughly and completely. OSHA has very detailed rules governing the selection and use of cranes and slings stated in 29 CFR 1910.179, 180, and 184. OSHA is very specific about what equipment must be inspected daily, and what may require periodic inspection to prevent accidents with cranes, slings, and other rigging hardware.

Crane hooks, shackles, chain hoist, spreaders and other rigging equipment must be thoroughly inspected for wear and unusual wear, bending or twisting of the metal, chips or dents stress fractures or cracks. Anything that does not look new or in new condition should not be used. If there is any question to the integrity of any hardware, it must be set aside for further detailed inspection and replaced with new equipment if necessary. All new equipment must also be inspected before use. All cranes and rigging equipment are rated for capacity, and the rated capacity should never be exceeded. A good work practice is to avoid exceeding 75% of rated capacity for slings shackles, crane hooks, spreader bars and the like.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
732-222-3553
http://www.rbaker.com

Full News Archive

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

CPR and First Aid Training Class @ R.Baker & Son
Why CPR and First Aid Training is Critical in Construction

There is no question that having employees who are trained in CPR and first aid has many benefits, first and foremost the fact that it saves lives. But CPR and first aid training can be particularly...
University Hospital NY - Renovation Project
Hospital Renovation Project

A large university hospital in New York had several buildings on campus. The central building, a 75,000 sq. ft. four-story structure with a mechanical penthouse was the first to be erected in 1944,...
Demolition Contractor: Earning & Keeping Our Reputation
Demolition Contractor: Earning and Keeping Our Great Reputation

A demolition contractor’s reputation is everything, and what can take decades to build can be lost very quickly if great care is not taken. Customers have specific overall expectations, most...
Rigging Setting the Final Pieces of Process Equipment
Rigging Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...
Demolition Project Goes Underground
Demolition Project Goes Underground

A 175,000 square-foot OTC R&D and production building, constructed in the early 1960s, was undergoing complete interior demolition to be repurposed as a pilot facility. The demolition schedule...
Copper Recycling Offsets Dismantling Project Costs
Copper Recycling Offsets Dismantling Project Costs

A large electrical-mechanical contractor hired R. Baker & Son to perform all of the electrical equipment dismantling and mechanical equipment removal at an old vitamin production facility...
CUP Multi-Phase Selective Demolition Project: Demo by Color
CUP Multi-Phase Selective Demolition Project: Demo by Color

An aging central utility plant serving a large northern New Jersey hospital was due for complete renovation, including the replacement of almost all equipment including boilers, chillers, cooling...
Rigging Safety Guidelines - Industrial Services
Rigging Safety Guidelines

Safety is paramount at R. Baker & Son, which is why we strictly observe all rigging safety regulations, guidelines and procedures on every lift we do. Guidelines for rigging safety: Inspect...