asset recovery, rigging team with sling and interior demolition

Challenging Duct Demolition

Challenging Duct Demolition

A rare malfunction in a large HVAC system caused exhaust ductwork to collapse due to a severe negative pressure condition, and building owners were faced with a dilemma. The 160-ft. duct had to be replaced as soon as possible, but it ran 22 feet above the finished floor surrounded by a maze of conduit, piping, sprinkler, controls, and pneumatic lines, to name just a few, making it virtually impossible to access. When the job was deemed too difficult and dangerous for sheet metal workers, R. Baker & Son was called in.

After a careful assessment of the situation, the Baker Team determined that there were only two areas from which the collapsed 40-inch. stainless steel round duct could be accessed. The entire run would need be cut out piece by piece and removed from these two areas and new duct would be installed through these same openings. A Baker demolition crew erected two scaffolds and fastened steel walkways between trapeze supports to give some walkable access and fall protection tie-off points, then set up a cabling system upon which canvas slings would be suspended.

Next, demolition workers used hydraulic shears to cut out 6- to 8-ft. sections of the old duct. The sections were cradled in the canvas slings and carefully lowered to the mechanical room floor below. Newly-fabricated 6- to 8-ft. flanged sections of stainless steel duct was brought in, and Baker crew members carefully threaded the new sections one by one through the maze of pipes, bolted the flanges with gasketing, and tightened the bolts down with torque wrenches to eliminate air leaks. Once the ductwork was successfully pressure tested, the Baker Team removed the scaffolding and the since-repaired HVAC system was put back on line.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Business (SDVOB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

http://rbaker.com/

 

Full News Archive

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

CPR and First Aid Training Class @ R.Baker & Son
Why CPR and First Aid Training is Critical in Construction

There is no question that having employees who are trained in CPR and first aid has many benefits, first and foremost the fact that it saves lives. But CPR and first aid training can be particularly...
University Hospital NY - Renovation Project
Hospital Renovation Project

A large university hospital in New York had several buildings on campus. The central building, a 75,000 sq. ft. four-story structure with a mechanical penthouse was the first to be erected in 1944,...
Demolition Contractor: Earning & Keeping Our Reputation
Demolition Contractor: Earning and Keeping Our Great Reputation

A demolition contractor’s reputation is everything, and what can take decades to build can be lost very quickly if great care is not taken. Customers have specific overall expectations, most...
Rigging Setting the Final Pieces of Process Equipment
Rigging Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...
Demolition Project Goes Underground
Demolition Project Goes Underground

A 175,000 square-foot OTC R&D and production building, constructed in the early 1960s, was undergoing complete interior demolition to be repurposed as a pilot facility. The demolition schedule...
Copper Recycling Offsets Dismantling Project Costs
Copper Recycling Offsets Dismantling Project Costs

A large electrical-mechanical contractor hired R. Baker & Son to perform all of the electrical equipment dismantling and mechanical equipment removal at an old vitamin production facility...
CUP Multi-Phase Selective Demolition Project: Demo by Color
CUP Multi-Phase Selective Demolition Project: Demo by Color

An aging central utility plant serving a large northern New Jersey hospital was due for complete renovation, including the replacement of almost all equipment including boilers, chillers, cooling...
Rigging Safety Guidelines - Industrial Services
Rigging Safety Guidelines

Safety is paramount at R. Baker & Son, which is why we strictly observe all rigging safety regulations, guidelines and procedures on every lift we do. Guidelines for rigging safety: Inspect...