All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

Rigging & Assembly Teams Install Pharma Fill Line

riggers and millwrights, lyophilizer

R. Baker & Son was contracted by a long-time client to install a large vial fill line with a Class 100 environmental tunnel with a large lyophilizer and auto-loader system. This entailed rigging and maneuvering multiple pieces of pharmaceutical manufacturing equipment into a space and connecting them with laser accuracy. Multiple pieces of equipment were manufactured and shipped from all over the world, and eventually they would need to come together with tolerances of less than one millimeter. To ensure pinpoint accuracy, R. Baker & Son used building information modeling (BIM), vendor shop drawings, and lasers to lay out the fill line, auto-loader and lyophilizer. 

The first item to arrive was the Class 100 tunnel, which was brought into the process area and assembled by R. Baker & Son millwrights with the vendor’s assistance. After protecting it with blanketing, wood supports, and rubber pads, the tunnel assembly was hoisted 7-ft. above the finish floor and suspended from overhead steel beams using spreader bars, several chain hoists, and two forklifts. 

Baker riggers and millwrights then brought in multiple sections of the fill line. They were assembled and placed beneath the Class 100 tunnel using the laser-aligned planes to ensure complete accuracy. Once the fill line manufacturer verified that it was assembled and installed to their satisfaction, the R. Baker & Son rigging crew lowered the suspended tunnel to the fill line.

The auto-loader was brought in next. Because the fill line and auto-loader had been made by two different manufacturers, minor field modifications were required to allow the two pieces of equipment to connect properly. These modifications were performed over several days by R. Baker & Son with the assistance of the manufacturer. 

Finally, the lyophilizer system, which consisted of a large chamber that would connect to the auto-loader, a vacuum condenser, and a refrigeration skid, was brought in by the rigging team using two large forklifts, skates, several chain hoists, and a gantry. The equipment was, again, placed with complete accuracy to ensure that prefabricated piping would connect without issue. 

With R. Baker & Son’s portion of the project complete, the process mechanical, electrical and instrumentation crews came in to perform wiring, pipe installation, and prepare the equipment for startup while the room finishes were being completed during off-hours.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Business (SDVOB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553
http://rbaker.com/index.php

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...
Industrial building demolition with advanced machinery by R. Baker & Son
R. Baker & Son: Experts in Modern Demolition Technology

Building demolition technology has undergone remarkable transformations over the decades, reflecting advancements in engineering, safety standards, and environmental stewardship. The evolution from...
Ground Penetrating Radar (GPR) - Demolition Contractor R. Baker & Son
Ground Penetrating Radar - Must have tool in Concrete Cutting and Demolition

At R Baker we have been involved with many demolition projects each one having its own set of challenges. When cutting concrete in an active facility or performing select or partial demolition you...
R. Baker & Son riggers installing 24 pharmaceutical bioreactors with platforms and safety railings in upstate New York facility
How We Installed 24 Bioreactors in Just 4 Weeks (NY Pharma)

R. Baker & Son recently completed a complex pharmaceutical equipment installation project after receiving a referral from a senior process engineer at a leading New Jersey design firm. The...
Professional Rigging Services: Expert Equipment Handling and Installation to Avoid Costly Damage
Professional Rigging: Why Equipment Installation Requires Expert Expertise

Comprehensive Rigging Services Across Industries R Baker & Son's rigging teams collaborate with equipment manufacturers across virtually every major industry. This extensive experience...