asset recovery, rigging team with sling and interior demolition

Total Demolition, Stadium-Style

Total Demolition, Stadium-Style

Stadiums for professional sports teams are hubs of entertainment for millions of people around the country, and many of us feel a deep nostalgia for our favorite teams’ stadiums. But, like most things, stadiums that were once shiny and new become old and antiquated, and it becomes necessary to replace them with new. Older stadiums lack the seating capacity, private party boxes, restaurants, concession stands, and restroom facilities to meet modern standards, not to mention Jumbotrons, large monitors, and lighting and sound systems. This means total demolition of the old stadium to make way for the new.

In many stadium construction projects, the new stadium is erected, oftentimes directly adjacent to the old stadium, before the old stadium is demolished so there is no interruption to the sports teams’ seasons. Then, everything of any sentimental value – seats, signs, pieces of the scoreboard, grass from the outfield – is recovered from the condemned stadium for sale to the highest bidders. Seats from Yankee Stadium can still be found on eBay for $450.

For some stadiums, such as Yankee Stadium and Giants Stadium, total demolition is performed by cutting, chopping and removal by multiple hydraulic excavators and other high-reach equipment. Other stadiums, including Texas Stadium and Seattle’s Kingdome, are reduced to rubble by controlled blast. Due to nostalgic value, stadium demolition is usually well-documented through time-lapse photography, news coverage, and of online videos. The implosion of Texas Stadium was a festive-yet-bittersweet public event preceded by fireworks and attended by 25,000 spectators. Once demolished stadiums have been replaced with parking lots for new stadiums, retail properties, open space, and theme parks.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
732-222-3553

https://www.rbaker.com

 

 

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

The finishing beam used in the process weighed 2,600 lbs and had to be perfectly parallel and level to the drum it was refinishing, both within less than 1/64 of an inch.
Industrial Drum Refinishing Support: A Custom Rigging and Structural Solution

When a manufacturer we had previously performed rigging assembly and installation work for returned more than a year later with a unique and complex challenge, they knew who to call. The company...
Air skates (air casters) lifting and moving multi-ton industrial equipment using compressed air in a plant relocation project
Air Skates: How to Move Multi Ton Loads Without Touching the Floor

Air skates, also known as air casters, air skids, or air dollies, are a specialized rigging solution that R. Baker & Son has deployed for many years to move heavy machinery, fragile equipment,...
demolition innovation in protection - substation, non metallic wire mesh,
Demolition Protection: Safeguarding People, Property & Critical Systems

What Demolition Protection Truly EntailsIn the complex world of demolition, protection goes far beyond basic safeguards. As therecognized leader in demolition protection, R. Baker & Son defines...
R. Baker & Son rigging crew performing pre-construction planning and heavy equipment rigging for demolition and industrial plant relocation project
Precon Services for Demolition, Rigging & Plant Relocation

For more than 90 years, R. Baker & Son has been delivering expert precon services for demolition, rigging, and industrial plant relocation projects. Before any construction work begins, our team...
Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...