R. Baker & Son Hospital Wing Interior Demolition

Hospital Corridor Before Demolition by R. Baker & Son

R. Baker & Son was awarded a project to perform interior demolition of a 55,000 sq/ft three-story patient area in a New York hospital. The wing, erected in the early 1980s and renovated in the early 2000s, required a complete overhaul to make room for larger patient rooms and state-of-the-art nursing and computer monitoring stations on each floor.

The demolition areas were tested and deemed free from asbestos and lead paint hazards. We worked closely with electrical and mechanical contractors to shut down, drain, and isolate all utilities and power sources. This process presented challenges, as many of the old hot water and chilled water valves were not holding, necessitating further shutdowns and valve replacements using nitrogen freezing techniques.

The primary challenge was to demolish all walls, ceilings, and MEP systems swiftly to facilitate the new construction. By demolishing the piping and ductwork in the vertical shafts, R. Baker transformed them into efficient trash chutes. Additionally, two sets of windows per floor were removed and replaced with exterior garbage chutes, allowing for the disposal of smaller materials into dumpsters below. For larger debris, small bobcats were utilized on the first floor, transporting the waste through a separate corridor to the loading dock.

While the windows were being removed and replaced, R. Baker & Son employed scraping machines to remove the old tile flooring, paving the way for floor leveling activities and the installation of epoxy corridors and sheet vinyl in the patient rooms.

By employing these four strategic debris exit points per floor, R. Baker successfully reduced the demolition time by two weeks. Ahead of schedule, the construction manager expanded R. Baker's scope to include the removal of all through-the-wall Nesbitt heating and cooling units below the windows, as well as the existing patient rooms and associated piping on the exterior walls. Additionally, all existing windows were methodically removed as new units were installed. 

The project also encompassed the removal of several general exhaust fans, associated ductwork, and several condensers for the IDF closets after refrigerant reclamation, as the roof was scheduled for replacement.

By employing an efficient demolition approach, R. Baker & Son not only saved time but also obtained additional project work, accelerating the overall schedule. This timely execution was crucial for the hospital, ensuring the prompt completion of the new, state-of-the-art patient area.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Minority and Women-Owned Business Enterprise (M/WBE), in business since 1935, is a premier specialized contractor operating in the United States, Canada, and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in six sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities of over $20 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://www.rbaker.com/interior_demolition.php

Full News Archive

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Professional building demolition with hydraulic shear in urban setting
Professional Building Demolition: Why Structural Knowledge Matters

To be successful in professional building demolition and dismantling, you need to be an experienced demolition expert in taking buildings down - whether in whole, in part, or in pieces. Providing...
Strategic demolition of industrial warehouse for brownfield redevelopment into sustainable community space in urban renewal project
Demolition & Brownfield Redevelopment: Sustainable Urban Renewal

One of the greatest environmental impacts we can make comes through the strategic demolition and brownfield redevelopment process. This powerful combination represents far more than simple building...
Crane rigging sets construction trailers at NJ hospital renovation site
Rigging Streamlines NJ Hospital Renovation Mobilization

Getting a new project up and running requires planning, organization, and detailed layout, all of which must be done quickly and efficiently. This was certainly the case when one of our clients, a CM...
Demolition Equipment in the field, R. Baker & Son
Sustainable Demolition Services: R Baker's Lean Meets Green Approach

Over our 90 years in business, R. Baker & Son has witnessed tremendous changes and progress in the demolition industry. Today's demolition work presents unique challenges and opportunities...
Warehousing and industrial rigging services for plant relocation.
Plant Relocation Services: Planning & Production | R. Baker & Son

The decision to relocate a manufacturing facility represents one of the most significant undertakings a company can face. Success hinges on expert project management, strategic planning, and seamless...
Rigging equipment ready for a heavy lift, NYC, NJ
Industrial Rigging NYC & NJ: Choosing Your Urban Partner

New York City and New Jersey's iconic skylines? They're pure proof of incredible construction and engineering. But peel back the layers of every towering building and complex industrial spot,...
Heavy equipment rigging during the installation of a new grain silo and processing system by R Baker.
Grain Silo & Equip. Installation: R Baker

R. Baker recently completed a challenging and uniquegrain processing installation, involving theheavy equipment riggingandindustrial equipment installationof four 70-foot processgrain silos, an...
Specialized healthcare demolition ensuring sterile environments with ICRA compliance.
Healthcare Demolition: ICRA Protocol & Clean Environments

Healthcare facilities present some of the most challenging environments for interior and selective demolition projects, where maintaining a sterile, contamination-free environment is absolutely...