All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

Hurricane Ida Ground Stabilization

outdoor silos, recycling plant construction, rigging

On September 1, 2021, the remnants of Hurricane Ida swept across the Northeast, leaving record-breaking amounts of rain in her path. At the time, several R. Baker & Son crews were in the midst of a large, state-of-the-art recycling plant construction project in eastern Pennsylvania where truck loading platforms and six 50-foot outdoor silos were being erected. Our crew of riggers and millwrights were working 10-hour shifts alongside electricians, process piping mechanics, and instrumentation technicians to complete the project by the end of the month. The storm dumped more than five inches of rain on the job site over the course of the day. 

Construction crews returned to work early the next morning to find deep mud with small gullies threading throughout the site where gravel and soil had been washed out by the copious rainfall. It was immediately obvious that operating several 50-foot boom lifts and an 80-ton mobile crane on the soft, unstable, uneven ground would be impossible. Construction managers considered spreading more gravel over the site, but that plan was quickly ruled out as the heavy equipment would simply push the gravel down into the mud. They were considering calling off work for the day while they figured out what to do, but R. Baker & Son’s project manager and crew had already come up with a solution. 

R. Baker & Son set in motion a plan to quickly transport dozens of steel plates to the job site. While they were awaiting delivery, two Bobcats set to work removing soil from the muddiest areas around the facility, replacing it with dry fill, and topping it with gravel. By mid-morning, the work had been completed. Shortly thereafter, the 46 steel plates arrived on site, and our rigging crew arranged them strategically around the structure on the newly compacted soil and gravel. 

The entire operation stabilizing the ground and allowing free, safe mobility for the mobile crane and various articulating booms and lifts and was completed by noon, and the trades quickly resumed working toward the common goal of meeting the project’s approaching end date.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Minority and Women-Owned Business Enterprise (M/WBE), in business since 1935, is a premier specialized contractor operating in the United States, Canada, and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities of over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746

https://rbaker.com/rigging-contractors.php

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

The finishing beam used in the process weighed 2,600 lbs and had to be perfectly parallel and level to the drum it was refinishing, both within less than 1/64 of an inch.
Industrial Drum Refinishing Support: A Custom Rigging and Structural Solution

When a manufacturer we had previously performed rigging assembly and installation work for returned more than a year later with a unique and complex challenge, they knew who to call. The company...
Air skates (air casters) lifting and moving multi-ton industrial equipment using compressed air in a plant relocation project
Air Skates: How to Move Multi Ton Loads Without Touching the Floor

Air skates, also known as air casters, air skids, or air dollies, are a specialized rigging solution that R. Baker & Son has deployed for many years to move heavy machinery, fragile equipment,...
demolition innovation in protection - substation, non metallic wire mesh,
Demolition Protection: Safeguarding People, Property & Critical Systems

What Demolition Protection Truly EntailsIn the complex world of demolition, protection goes far beyond basic safeguards. As therecognized leader in demolition protection, R. Baker & Son defines...
R. Baker & Son rigging crew performing pre-construction planning and heavy equipment rigging for demolition and industrial plant relocation project
Precon Services for Demolition, Rigging & Plant Relocation

For more than 90 years, R. Baker & Son has been delivering expert precon services for demolition, rigging, and industrial plant relocation projects. Before any construction work begins, our team...
Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...