Weekend Standby Generator Replacement

Generator Replacement

A large laboratory and office complex needed to replace an existing standby generator with a new, larger 2000 kW unit with associated automatic transfer switches and day tank. The owner needed the project to be completed over a long weekend beginning on Friday morning and ending on Monday afternoon, so the electrical contractor tasked with replacing the generator chose R. Baker & Son to assist in this critical replacement project. 

The electrical contractor had prepared for the weekend installation over a few months. Due to the critical nature of the project, a site-specific safety plan was developed along with a method of procedure specifying which teams would be performing certain tasks, and when. The weather forecast looked good, with cool temperatures and a few scattered showers expected over the weekend. 

R. Baker & Son and the electrical crew arrived early on Friday morning. While electricians were shutting down and disconnecting electrical power from the generator, R. Baker millwrights and rigging team members were simultaneously disassembling the old standby generator and separating the diesel engine from the condenser/fan section. A second rigging team removed the four large louvers and dampers, allowing access to a rear parking lot area. By late afternoon on Friday, the project had progressed to where the 80-ton hydraulic crane could begin removing pieces of the generator. 

On Saturday, the Baker rigging team had removed the remains of the old generator by mid-morning and the area was cleaned and prepped with pre-fabricated steel pieces. Riggers carefully brought in the new generator using spreader bars, slings, chain blocks, and a fork lift and precisely set it in place where new electrical conduit and fuel lines sat ready for connection. The Baker Team assisted the electrical contractor with installing ATS switches, mounting the day tank, installing the exhaust system, and various other tasks. The outside louvers and dampers were reinstalled, and all remaining debris was removed. Because of all the intensive preparation, pre-fabrication, and close coordination between the electrical and rigging teams, the new generator was wired and ready for startup and testing bright and early on Tuesday morning. 

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Minority and Women-Owned Business Enterprise (M/WBE), in business since 1935, is a premier specialized contractor operating in the United States, Canada, and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities of over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://rbaker.com/rigging-contractors.php

Full News Archive

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Secure storage of industrial boiler for rigging and assembly projects in New York and New Jersey.
Rigging Services for NYC and NJ: Offsite Storage & Asset Management

For rigging projects in New York City and New Jersey, access to secure offsite storage and asset management is a crucial component of rigging, setting, and assembly operations,helping accommodate...
Safe rigging procedures and equipment inspection - R. Baker & Son
Rigging: A Complete Guide to Safety, Equipment, and OSHA Standards

Rigging is one of the most critical operations in heavy industry, and at R. Baker & Son, we specialize in safe, compliant lifting with the right equipment, planning, and OSHA-certified practices....
Workers in PPE during National Construction Safety Stand Down
Construction Safety Stand Down: History and Purpose

The Construction Safety Stand Down is an annual event aimed at raising awareness about safety in the construction industry, particularly focusing on fall protection. This initiative serves as a...
R. Baker & Son performing safe, sustainable rigging and demolition in NYC and NJ, with turnkey and MWBE-certified services
The Future of Rigging & Demolition in NY & NJ

The Evolving Landscape of Heavy Industrial Services in NYC & NJ R. Baker & Son stands as a cornerstone in the industrial services sector, with a profound legacy rooted in decades of...
Rigging NY and NJ icons, Statue of Liberty, R. Baker and Son
Rigging NYC and NJ - Most Iconic Structures with Expert Precision

For 90 years, R. Baker & Son has been a cornerstone of rigging services in New York and New Jersey, expertly undertaking complex lifting, moving, and safeguarding operations for some of the...
Telescopic crane lifting heavy equipment during a rigging project in NJ & NY
Why Telescopic Cranes Are Essential in Rigging Work

It is remarkable how innovation and technology continue to change and improve construction equipment. Manufacturers have evolved to create machinery that serves multiple purposes at job sites. A...
16,000-gallon mixing tanks, each with an 18-ft agitator with a 3-inch shaft
Expert Rigging and Maintenance for Industrial Mixing Tanks

A new client reached out to R. Baker for rigging services, regarding a challenging issue affecting their production and throughput. We were referred by an engineer with whom we had worked in the...
Vertical Water Curtains, The Future of Dust Control, Dustboss Water Cannon
Vertical Water Curtains: The Future of Dust Control in Urban Implosions

Many implosion demolition projects always make the news as it's impressive to see a perfectly timed implosion where the building literally falls into itself. The engineering behind it and the...