asset recovery, rigging team with sling and interior demolition

Disassemble and Relocate Water Treatment Systems

Water Treatment Systems

When a food manufacturer and longtime R. Baker & Son client decided to sell off their existing reverse osmosis and pH waste neutralization systems at their northeastern Pennsylvania manufacturing facility and upgrade to larger-capacity equipment, our team was called in to handle disassembly, rigging, match-marking, packing, and shipping of the equipment to a buyer in the midwest. 

First, both the reverse osmosis and pH waste neutralization systems were shut down, salt and filters were removed, all containers were thoroughly cleaned, and the RO water membranes were isolated and packed for shipment. Next, the pH waste tank and agitators were power washed, and all piping was disconnected and carefully marked and tagged. The unit was shrink-wrapped, rigged from the building, and loaded onto a large trailer. 

The stick-built RO water system was photographed and 3D-scanned before all stainless-steel sanitary piping, fittings, and pieces were tagged and labeled in detail so that they could be reassembled as quickly and easily as possible. All hardware was labeled and packed into heavy-duty plastic drums, and gaskets were removed and discarded as they were to be replaced by the new owners once they reached their destination. The RO water tanks, large fiberglass canisters, and membrane housings were loaded onto two box trucks for shipment. The vendor also provided new media, gaskets, various parts, and several instruments to be shipped in the trucks along with the units. 

Part of our client’s sales agreement was a guarantee that the new buyer would have everything needed to reassemble the two critical water systems and have them operational within ten days of their arrival, which would hinge upon R. Baker & Son’s thorough documentation, skill in machinery disassembly, careful packing and shipping, and accurate match-marking. This was accomplished as promised, resulting in two very satisfied customers.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Minority and Women-Owned Business Enterprise (M/WBE), in business since 1935, is a premier specialized contractor operating in the United States, Canada, and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in six sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities of over $20 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://www.rbaker.com/plant-relocation-services-contractor.php

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

R. Baker & Son rigging crew performing pre-construction planning and heavy equipment rigging for demolition and industrial plant relocation project
Precon Services for Demolition, Rigging & Plant Relocation

For more than 90 years, R. Baker & Son has been delivering expert precon services for demolition, rigging, and industrial plant relocation projects. Before any construction work begins, our team...
Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...
Industrial building demolition with advanced machinery by R. Baker & Son
R. Baker & Son: Experts in Modern Demolition Technology

Building demolition technology has undergone remarkable transformations over the decades, reflecting advancements in engineering, safety standards, and environmental stewardship. The evolution from...
Ground Penetrating Radar (GPR) - Demolition Contractor R. Baker & Son
Ground Penetrating Radar - Must have tool in Concrete Cutting and Demolition

At R Baker we have been involved with many demolition projects each one having its own set of challenges. When cutting concrete in an active facility or performing select or partial demolition you...
R. Baker & Son riggers installing 24 pharmaceutical bioreactors with platforms and safety railings in upstate New York facility
How We Installed 24 Bioreactors in Just 4 Weeks (NY Pharma)

R. Baker & Son recently completed a complex pharmaceutical equipment installation project after receiving a referral from a senior process engineer at a leading New Jersey design firm. The...