All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

R. Baker & Sons Demo Experience to Find the Best Plan

demolition workers looking at blueprints

“Why Didn’t I Think of That?”: Count on R. Baker’s & Son’s Demolition Experience to Find the Best Plan

One of the great benefits of hiring experienced contractors for a construction project is their ability to see things and come up with solutions that the client, designers, and project managers completely missed. These ideas are often seemingly simple but extremely beneficial to the project, as was the case on a recent renovation project at a 225,000 sq. ft. laboratory facility where R. Baker & Son would be performing selective demolition. 

The project master plan was to renovate the entire building in three phases over a five-year period. During each phase, two-thirds of the building would remain in use and there could be no interruptions for employees working in areas that were not under construction. As a result, considerable thought had gone into the planning effort, down to detailed color-coded drawings showing how, where, and when construction materials could be routed into the building and demolition debris could be routed out. 

R. Baker & Son’s demolition team was tasked with performing demolition during the day and staging the debris in the work zone for removal at night through long corridors that snaked through occupied areas of the building. Every other evening, a second shift would be brought in to protect the corridors with plastic sheeting, remove the debris from the building via the assigned route, then thoroughly clean all remaining traces of dust and dirt from the corridors before facility workers arrived the next day. 

The eureka moment came shortly after the project began when one of our demolition workers looked from a window onto a vacant courtyard. What if this courtyard could be used to stage and remove the debris instead of having to laboriously cart it through long hallways? We checked the drawings, and sure enough, the courtyard, which was slated to be converted into an outdoor eating area during the last phase of the project, was perfectly situated for our demolition team’s purposes. 

With the client’s approval, R. Baker & Son removed several large windows opening onto the courtyard so debris could be easily removed and stored. Every other weekend, we brought in a small rigging team to remove the debris from the courtyard by crane to waiting dumpsters and trucks. This simple change in project plans completely eliminated the need for a second shift, significantly reduced the time and effort that would be required to remove demolition debris, and alleviated all of the client’s concerns about contaminating occupied areas of the laboratory facility.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Minority and Women-Owned Business Enterprise (M/WBE), in business since 1935, is a premier specialized contractor operating in the United States, Canada, and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in six sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities of over $20 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://www.rbaker.com/

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Precision Chiller Dismantling & Mechanical Retrofit Case Study
Precision Chiller Dismantling & Mechanical Retrofit Case Study

A local New Jersey representative for a major chiller manufacturer recommended R. Baker & Son for a demanding chiller change-out project. The scope: remove two 1,200-ton chillers and their...
Discover how a custom negative pressure wall and real-time monitoring protected a pharmaceutical cleanroom during high-stakes facility demolition.
How to Protect Active Cleanrooms During Demolition: A Negative Pressure Wall Case Study

Protecting a client's environment during demolition and renovation work has always been part of what we do at R. Baker & Son. Anyone in the industry knows ICRA protection, the barrier system...
rigging medical equipment into a hospital - R. Baker & Son
Just-in-Time Rigging Keeps a Hospital Running During a Critical Enabling Project

R. Baker & Son received a call from a concerned South Jersey mechanical contractor facing a complex rigging project on a tight deadline. Another rigging contractor had passed on the job late in...
Riggers assembling tower crane sections during construction - R. Baker & Son - Master Riggers.
How Mobile and Tower Cranes Are Assembled & Dismantled

Mobile cranes come in many styles, shapes, and sizes, with the hydraulic crane and the luffing jib being the most common. R. Baker & Son has worked with just about every mobile crane on the...
Demolition concrete debris fed into an industrial crusher for recycling
7 Ways Demolition Protects Communities & the Planet

7 Ways Demolition Builds Better Communities -And Why It Matters When most people picture demolition, they see dust clouds and falling walls. What they don't see is the careful planning,...
R. Baker & Son industrial contractors executing mission-critical transformer replacement with rigging equipment at medical facility
How R. Baker & Son Executes High-Stakes Projects with Engineered Work Plans

Mission-critical and high-stakes projects demand detailed, preplanned coordination to ensure success at every level. When it comes to plant shutdowns, startups, repairs, changeovers, and equipment...
R. Baker & Son rigging team performing final precision positioning and alignment of a multi-ton medical MRI magnet onto its concrete anchoring pad inside a specialized hospital imaging room.
MRI & Medical Imaging Equipment Rigging: A Turnkey Installation Case Study

Medical equipment rigging and installation requires a specialized approach to protect high-value, delicate assets. At R. Baker, we successfully navigate these complex rigging projects using...
R. Baker and son welding on complex hospital demolition job
Hospital Boiler Room Demolition: Removing Steam Boilers and Mechanical Equipment

R. Baker & Son was tasked with a complex demolition project at an active hospital, systematically removing two aging Cleaver-Brooks steam boilers (a 350 HP and a 200 HP unit), along with an...