Rigging Success: Chiller & Cooling Tower Installation at Jersey Hospital

Chiller and Cooling Tower Installation at a South Jersey Hospital

Recently, R. Baker & Son team was faced with the task of installing a new 1200-ton chiller and double cell cooling tower at a South Jersey hospital. The project was referred to us by a trusted mechanical contractor. With limited space in the hospital's existing mechanical room, the task of maneuvering the large chiller and cooling tower components into place and assembling them would be challenging. Furthermore, the project had faced several scheduling delays due to the hospital's needs, adding to the pressure of completing it efficiently.

The Baker team carefully assessed the site, considering every detail of how the equipment would be brought in and assembled, and devised a meticulous rigging plan. Collaborating with experienced riggers and other contractors, we ensured that we had the necessary equipment and materials to execute the plan effectively.

We finally received a firm rigging date, and with pre-demolition completed, including removal of ductwork and sprinklers, we had a two-day window to get everything done. Utilizing a 130-ton crane with an extended jib, we carefully rigged the chiller in five separate pieces into the building. They were maneuvered through the mechanical room on skates past various other equipment and obstacles, and set onto a new seismic housekeeping pad.

The motor section was raised using a field-fabricated gantry and mounted on top of the condenser and evaporator barrels. This assembly was then lowered and mounted on the power and control cabinets.

The cooling tower was to be erected in a small area adjacent to other equipment. We used the crane to sequentially hoist the cooling tower cells, miscellaneous steel, isolation springs, piping, and control valves to waiting mechanical and electrical crews. Despite the compact quarters and tight schedule, R. Baker & Son was able to complete the project right on time.

 

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Minority and Women-Owned Business Enterprise (M/WBE), in business since 1935, is a premier specialized contractor operating in the United States, Canada, and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in six sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities of over $20 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://www.rbaker.com/

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

R. Baker & Son rigging crew performing pre-construction planning and heavy equipment rigging for demolition and industrial plant relocation project
Precon Services for Demolition, Rigging & Plant Relocation

For more than 90 years, R. Baker & Son has been delivering expert precon services for demolition, rigging, and industrial plant relocation projects. Before any construction work begins, our team...
Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...
Industrial building demolition with advanced machinery by R. Baker & Son
R. Baker & Son: Experts in Modern Demolition Technology

Building demolition technology has undergone remarkable transformations over the decades, reflecting advancements in engineering, safety standards, and environmental stewardship. The evolution from...
Ground Penetrating Radar (GPR) - Demolition Contractor R. Baker & Son
Ground Penetrating Radar - Must have tool in Concrete Cutting and Demolition

At R Baker we have been involved with many demolition projects each one having its own set of challenges. When cutting concrete in an active facility or performing select or partial demolition you...
R. Baker & Son riggers installing 24 pharmaceutical bioreactors with platforms and safety railings in upstate New York facility
How We Installed 24 Bioreactors in Just 4 Weeks (NY Pharma)

R. Baker & Son recently completed a complex pharmaceutical equipment installation project after receiving a referral from a senior process engineer at a leading New Jersey design firm. The...