Industrial Drum Refinishing Support: A Custom Rigging and Structural Solution

The finishing beam used in the process weighed 2,600 lbs and had to be perfectly parallel and level to the drum it was refinishing, both within less than 1/64 of an inch.

When a manufacturer we had previously performed rigging assembly and installation work for returned more than a year later with a unique and complex challenge, they knew who to call. The company needed to strip the finish from eight dryer drums and have a new stainless finish applied as part of critical equipment maintenance. They turned to R. Baker to make it happen.

The project came with several significant obstacles. With four machines on the floor, only one could be taken offline at a time while the remaining three stayed in operation. That required our team to carefully isolate each dryer from its utilities and install separation curtains to protect the active equipment.

The surface refinishing contractor had highly specific requirements to successfully remove and reapply a finish on each drum. The process had zero tolerance for inconsistencies, and it had to be completed quickly since the contractor was already committed to other projects overseas.

The finishing beam used in the process weighed 2,600 lbs and had to be perfectly parallel and level to the drum it was refinishing, both within less than 1/64 of an inch. As the drum rotated at a precise 5 RPM, the finishing beam traveled along its length, simultaneously removing the old surface and applying the new one. Any movement or deflection in the support structure would compromise the finish and potentially distort the drum itself, which would have been a costly and time-consuming setback.

With eight drums to refinish, the finishing beam needed to be relocated from drum to drum every 48 to 56 hours. Each drum had slightly different surrounding dimensions, meaning support configurations could not simply be replicated from one setup to the next. Adding to the complexity, each drum measured 4 feet wide by 16 feet long and sat eight feet above the finished floor, making anchoring the finishing beam a significant engineering challenge.

Our team assessed the full scope of the project and designed a custom support system engineered to work across all eight drums using a small number of anchor points and threaded adjustments for precise leveling. Rather than building a dedicated structure for each drum, we developed a modular solution that could be assembled, disassembled, and reassembled in one to two hours and relocated efficiently between setups. We engaged a trusted structural engineer to assist with the design, allowing the steel to move from concept to fabrication quickly. Our team successfully relocated the dryer refinishing system from drum to drum on a 48-hour cycle or better throughout the project.

Our client was pleased with the outcome. All eight drums were refinished to specification, and the facility returned to full operation on schedule. At the conclusion of the project, the custom support system was disassembled, packaged, and stored on-site for future use when the need arises again.

R. Baker & Son - Rigging & Demoliton Contractors
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://www.rbaker.com/rigging-contractors.php

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Air skates (air casters) lifting and moving multi-ton industrial equipment using compressed air in a plant relocation project
Air Skates: How to Move Multi Ton Loads Without Touching the Floor

Air skates, also known as air casters, air skids, or air dollies, are a specialized rigging solution that R. Baker & Son has deployed for many years to move heavy machinery, fragile equipment,...
demolition innovation in protection - substation, non metallic wire mesh,
Demolition Protection: Safeguarding People, Property & Critical Systems

What Demolition Protection Truly EntailsIn the complex world of demolition, protection goes far beyond basic safeguards. As therecognized leader in demolition protection, R. Baker & Son defines...
R. Baker & Son rigging crew performing pre-construction planning and heavy equipment rigging for demolition and industrial plant relocation project
Precon Services for Demolition, Rigging & Plant Relocation

For more than 90 years, R. Baker & Son has been delivering expert precon services for demolition, rigging, and industrial plant relocation projects. Before any construction work begins, our team...
Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...
Industrial building demolition with advanced machinery by R. Baker & Son
R. Baker & Son: Experts in Modern Demolition Technology

Building demolition technology has undergone remarkable transformations over the decades, reflecting advancements in engineering, safety standards, and environmental stewardship. The evolution from...