Dust, Noise and Vibration During Demolition

 

Demolition is usually the first phase of a renovation project, and it requires careful planning and a highly experienced contractor. But even though it is very important to the entire project schedule to complete the demolition phase on time, design drawings are often lacking in detail, and means and methods are left to the demolition contractor.

Demolition timing and logistics must be carefully coordinated with owners and facility managers to make sure that business operations and production continue smoothly, with no disruption.  R. Baker & Son has extensive experience filling in the fine details required to complete this phase swiftly, safely, and efficiently.

Dust, noise, and vibration are often major concerns and must be addressed in detail.  Dust can be alleviated by wetting surfaces, capturing particles with fog or spray, or using exhaust systems.  Noise and vibration are largely inevitable byproducts that can be annoying to workers and disruptive to productivity, so it is important to work closely with owners to carefully schedule tasks that will create dust, noise, vibration, or any combination of the three.  For example, a job requiring the use of jackhammers can be scheduled on a particular day from 6 to 8 a.m., noon to 1 p.m., and 4 to 6 p.m.  This allows management to plan ahead and work around these conditions without any surprises or unexpected disruptions.

A Rigging and Routing Plan is another important part of the demolition phase of a project.

R. Baker & Son is familiar with the many complexities involved in moving large pieces of equipment such as lyophilizers, air handling units, isolators and boilers.  Careful planning is required to determine when and how to move these items, and through what access points, and
rigging is coordinated to occur during convenient off hours when personnel safety won’t be compromised. 

R. Baker & Son has countless successful demolition projects under our belts and can provide clients with demolition schedules and Rigging & Routing Plans that address all project concerns and details.  Please contact us if we can help with your next project.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor in the United States, Canada and Puerto Rico. The Service-Disabled Veteran-Owned Small Business (SDVOSB) has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million). Capabilities include industrial and commercial demolition, rigging, machinery & plant moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, wrecking, selective demolition , demolition contractors in NJ and warehousing.

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: www.rbaker.com

For more information visit our website or contact Damon Kozul, PE, CHMM at dkozul@rbaker.com

 

Full News Archive

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

holding tank agitators, bioprocess facility
Plant Machinery Updates and Replacements

An equipment manufacturer that had worked closely with R. Baker & Son in the past called us regarding a bioprocess facility requiring several key changes to eight large holding tank agitators....
Understanding Physics and Construction are Vital in Demolition
Understanding Physics and Construction are Vital in Demolition

When demolishing a building or other structure, it’s important for the demolition contractor to first understand how it was constructed. The way in which foundations, frames, floors, beams,...
Hazard signs for demolition and construction company R. Baker
Slips, Trips and Falls According to OSHA

According to OSHA, slips, trips, and falls account for the majority of general industry accidents, and they are the greatest hazard in the construction industry. Each year, more than 500,000...
Fire truck being lowered into 9/11 Museum NYC
Spreader Beams a Top Choice for Rigging Stability and Safety

The spreader beam, also known as a spreader bar, is a popular below-the-hook lifting device used to widen lifting points and stabilize and support a load during a crane lift. It consists of a long...
Safety Basics for Demolition Work, photo shows lighting around demolished concrete
Important Safety Basics for Interior Demolition Projects

Demolition can be a dirty business with ever-changing safety concerns. Every project is unique, but there are three basic things that should be addressed in every interior demolition project to help...
Tool and Equipment Tracking - Crane Rigging NYC
Tool and Equipment Tracking - Crane Rigging

Crane rigging requires a lot of tools and equipment. Visitors to a large R. Baker & Son rigging operation might see forklifts, cranes, excavators, generators, articulating booms, front loaders,...
 Sweeping Compounds for Cleanup of Demolition Dust, Dirt, Silica, and Other Particulates
Cleanup of Demolition Dust, Dirt, Silica, and Particulates

Demolition is a dirty job that can produce layers of dirt, dust, and silica that settle on floors and other flat surfaces. There are various techniques and equipment such as misting cannons,...
Rigging equipment, rigging hook, NYC
Auger and Centrifuge Rigging Project

An existing customer called R. Baker & Son needing assistance with rigging equipment duringtheir facility’s annual cleaning and maintenance project. The manufacturing plant was set up for...